Main projects
Compressor stations:
- CD 3-b CS 16 "Yubyleynaya" reconstruction, (Russia);
- CD 4 CS 16 "Yubyleynaya" reconstruction, (Russia);
- CS "Krasiliv" ACS GTK-10;
- CS Proletarsky underground storage facility, reconstruction;
- condensate fields booster CS Komyshnyanskoho, Potichanskoho, Horobtsivskoho, Opishnyanski;
- CS "Novosibirsk", "Nyuksenytsa" technical inspection, engineering survey, (Russia);
- "Reconstruction of compressor station No. 4 KS-16 “Jubileinaya";
- design feasibility study (FS) construction - Renovation of the compressor station "Komarno".
The gas pipeline linear part (sections):
- Pochinki - Hryazovets;
- Parabel - Kuzbass;
- Kyyanly coastal pipeline - border of the Republic of Kazakhstan, Turkmenistan;
- Ukhta - Torzhok;
- Torzhok - Minsk - Ivatsevichi;
- The gas pipeline modernization Urengoy-Pomari-Uzhgorod;
- The main pipelines and road crossings capital repairing, water obstacles;
- detailed design for the project: "Turnkey" construction of the beam crossing the Amu Darya river, for the second leg of the pipeline "Malay - Bagtyyarlyk;
- "Creating a backup natural gas pipeline from the GDS -1 Severodonetsk to site PJSC "SEVERODONETSK AZOT";
- correction of the detailed project "Modernization and repair of MG UPU on section km 4101,3-4128,4";
- "Technical re-equipment of the gas pipeline from Vassishivske GCF to main gas pipeline";
- Engineering surveys along the oil pipeline for construction of the project: "Construction of main pipeline "Mozyr-Bernadi-Pryluky"";
- "Construction of the gas pipeline branch and GDS for gas supply LLC "BKZ";
- topographic-geodesic and hydro-meteorological engineering project works for the project: "Repair of the linear part of the pipeline with the pipe replacement phase I MO "Brody-state Border" DN 500 on section km 111 km 128".
Infrastructure facilities:
- Infrastructure reconstruction OJSC "Severnie Magistralnie Nefteprovodi";
- Yaraktinskoe OGCF Development. The gas part. Installing the preparation of natural and associated petroleum gas (UPPR) performance 3,6 million Nm3 per day";
- Platforms gas wells ¹ 301, ¹ 304, ¹ 305, ¹ 306, ¹ 307 Yaraktinskoe OGCF Development with the linear part of the pipeline";
- "Piping reconstruction from KS Aleksandrovka for gas transportation in the reverse direction (the stage of feasibility study, basic project and detailed design .
GDS:
- Voyskovytsi, Zubtsov, Krasnoarmeyets, Trud, Verhnovolzhska (Russia);
- Martusivka, Ladyzhynka, Kalush, Novoarkhangelsk (Ukraine);
- GDS “Ust Luga”.
AGFCS:
- Mamadish, Chystopil, Tatarstan (Russia);
- New Kakhovka (Ukraine).
Sites certification:
- Ukrainian gas transportation system.