Main projects

Compressor stations:

  • CD 3-b CS 16 "Yubyleynaya" reconstruction, (Russia);
  • CD 4 CS 16 "Yubyleynaya" reconstruction, (Russia);
  • CS "Krasiliv" ACS GTK-10;
  • CS Proletarsky underground storage facility, reconstruction;
  • condensate fields booster CS Komyshnyanskoho, Potichanskoho, Horobtsivskoho, Opishnyanski;
  • CS "Novosibirsk", "Nyuksenytsa" technical inspection, engineering survey, (Russia);
  • "Reconstruction of compressor station No. 4 KS-16 “Jubileinaya";
  • design feasibility study (FS) construction - Renovation of the compressor station "Komarno".

The gas pipeline linear part (sections):

  • Pochinki - Hryazovets;
  • Parabel - Kuzbass;
  • Kyyanly coastal pipeline - border of the Republic of Kazakhstan, Turkmenistan;
  • Ukhta - Torzhok;
  • Torzhok - Minsk - Ivatsevichi;
  • The gas pipeline modernization Urengoy-Pomari-Uzhgorod;
  • The main pipelines and road crossings capital repairing, water obstacles;
  • detailed design for the project: "Turnkey" construction of the beam crossing the Amu Darya river, for the second leg of the pipeline "Malay - Bagtyyarlyk;
  • "Creating a backup natural gas pipeline from the GDS -1 Severodonetsk to site PJSC "SEVERODONETSK AZOT";
  • correction of the detailed project "Modernization and repair of MG UPU on section km 4101,3-4128,4";
  • "Technical re-equipment of the gas pipeline from Vassishivske GCF to main gas pipeline";
  • Engineering surveys along the oil pipeline for construction of the project: "Construction of main pipeline "Mozyr-Bernadi-Pryluky"";
  • "Construction of the gas pipeline branch and GDS for gas supply LLC "BKZ";
  • topographic-geodesic and hydro-meteorological engineering project works for the project: "Repair of the linear part of the pipeline with the pipe replacement phase I MO "Brody-state Border" DN 500 on section km 111 km 128".

Infrastructure facilities:

  • Infrastructure reconstruction OJSC "Severnie Magistralnie Nefteprovodi";
  • Yaraktinskoe OGCF Development. The gas part. Installing the preparation of natural and associated petroleum gas (UPPR) performance 3,6 million Nm3 per day";
  • Platforms gas wells ¹ 301, ¹ 304, ¹ 305, ¹ 306, ¹ 307 Yaraktinskoe OGCF Development with the linear part of the pipeline";
  • "Piping reconstruction from KS Aleksandrovka for gas transportation in the reverse direction (the stage of feasibility study, basic project and detailed design .

GDS:

  • Voyskovytsi, Zubtsov, Krasnoarmeyets, Trud, Verhnovolzhska (Russia);
  • Martusivka, Ladyzhynka, Kalush, Novoarkhangelsk (Ukraine);
  • GDS “Ust Luga”.

AGFCS:

  • Mamadish, Chystopil, Tatarstan (Russia);
  • New Kakhovka (Ukraine).

Sites certification:

  • Ukrainian gas transportation system.

News

15.11.2016
There was held a meeting concerning the object "Interconnector gas pipeline construction,"Drozdovychy - Bilche-Volytsya" in Poland.... more
01.11.2016
Road Show in Denmark in the field of construction and alternative energy... more
11.09.2016
Celebrating professional employees day of the oil, gas and petrochemical industries.... more
19.08.2016
Meeting regarding the object "Interconnector gas pipeline construction,"Drozdovychy - Bilche-Volytsya"... more
20.05.2016
DIPROGAZ Ltd. has been awarded by JSC “Ukrtransgaz” Branch "on the construction management and reconstruction of the gas transportation system" under development "project" and "robochem documentation" on the project: "Construction of the main gas pipeline interconnector" Drozdovich-Bilche-Volitsa"... more

All news